biodiversity

Odra-Vistula Flood Management Project

Submitted by Anonymous (not verified) on
Est. Monetary Cost
(Today's US$)
19
Est Monetary Benefits
Unknown

The Government of Poland has requested funding to increase access to flood protection for people living in selected areas of the Odra River and the Upper Vistula River basins and to strengthen the institutional capacity of the Borrower to mitigate the impact of floods more effectively. The large-scale project will improve flood protection through selected structural gray measures, as well as green measures, institutional strengthening and enhance forecasting. Green measures will include opening space for the river to inundate the natural floodplain, while also diminishing flood velocities.

Nigeria Erosion and Watershed Management

Submitted by Anonymous (not verified) on
Est. Monetary Cost
(Today's US$)
540.96
Est Monetary Benefits
Unknown

The Government of Nigeria, through the Ministry of Environment, state and local governments, is implementing this project to reduce the vulnerability to soil erosion in targeted sub-watersheds. The multi-sectoral project will finance interventions to prevent and reverse land degradation on a demand-driven basis, initially focusing on gully erosion sites in southeastern states that threaten infrastructure and livelihoods.

Natural Resource Management in a Changing Climate in Mali

Submitted by Anonymous (not verified) on
Est. Monetary Cost
(Today's US$)
20.42
Est Monetary Benefits
Unknown

The objective of the project “Natural Resource Management in a Changing Climate in Mali” is to expand the adoption of sustainable land and water management (SLWM) practices in climate vulnerable targeted communes in Mali. The Government of Mali aims to achieve this through the implementation of capacity building, biodiversity conservation, and support to poverty reduction activities applying an ecosystem-based adaptation approach. This approach will enable project beneficiaries in 14 communities across three provinces to adapt to climate change and ultimately to increase their resilience.

Metro Colombo Urban Development Project

Submitted by Anonymous (not verified) on
Est. Monetary Cost
(Today's US$)
11.6
Est Monetary Benefits
Unknown

The project's objective is to support the Government of Sri Lanka in reducing the flooding in the catchment of the Colombo Water Basin, and strengthen the capacity of local authorities in the Colombo Metropolitan Area to rehabilitate, improve and maintain local infrastructure and services through selected demonstration investments. The project protected and provided some restoration to the city wetlands as a nature-based solution, allowing them to serve as flood rentention and recreational areas.

Kiribati Adaptation Program - Phase III Project (KAP III)

Submitted by Anonymous (not verified) on
Est. Monetary Cost
(Today's US$)
0.28
Est Monetary Benefits
Unknown

Combined, the engineered and nature-based measures (mangroves) have protected 1.37 kilometers of coastline (above the baseline) for a total of 1.87 kilometers28, exceeding both the revised PDO-level target of 1.2 kilometers and the original target of 1.6 kilometers. Community-based mangrove management plans have been prepared and adopted under the village development committees and are being implemented to ensure the sustainability of the coastal protection measures on the outer islands. Mangrove as NBS also noted as protecting water suplies from saltwater instrusion.

Integrated Disaster and Land Management Project

Submitted by Anonymous (not verified) on
Est. Monetary Cost
(Today's US$)
15.35
Est Monetary Benefits
Unknown

The project was comprehensive, using insitutional capacity building and awareness raising of SLM for DRM, using community-based activities to restore and sustainably manage areas such as the restoration of natural waterways, reforestation of hillsides and watersheds and bush fire control (Savanna, Maritime and Kara regions). Community-Based activities in Cropland and Grazing Land included SLM best practices will be piloted and promoted in targeted areas.

Integrated Disaster and Land Management

Submitted by Anonymous (not verified) on
Est. Monetary Cost
(Today's US$)
16.9
Est Monetary Benefits
Unknown

The project objective was to strengthen institutional capacity of targeted institutions to manage the risk of flooding and land degradation in targeted rural and urban areas. The Government of Togo aimed to achieve objective through 1) community-based activities in watershed and flood-prone areas; 2) community-based activities in cropland and grazing lands; 3) community-based sustainable forest and wetland management; as well as 4) early warning, monitoring and knowledge systems and 5) institutional strengthening and awareness raising.

Integrated Coastal Zone Management

Submitted by Anonymous (not verified) on
Est. Monetary Cost
(Today's US$)
25.48
Est Monetary Benefits
Unknown

The objective of the project implemented by the Government of Morocco is to pilot the application of an integrated coastal zone management (ICZM) approach on its eastern Mediterranean coast. ICZM implemented at local level by all users of the coastal resources will leverage rural pollution reduction and protection of biodiversity and ecologically sensitive areas. The project used non-structural and structural interventions, such as training on ecosystem-based co-management, wetlands and dune restoration, and the creation of an artificial reef. 