Skip to main content

grassland and other vegetation

Saramacca Canal System Rehabilitation Project

Submitted by Anonymous (not verified) on
Est. Monetary Cost
(Today's US$)
8.8
Est Monetary Benefits
Unknown

The project will use green solutions may also be trialed to remove pollution, such as introducing flood retention areas (ponds or wetlands) with recreational amenities, establishing green corridor parks, and introducing permeable paving to encourage infiltration or bioretention areas with enhanced vegetation and filtration.

Meghalaya Integrated Transport Project

Submitted by Anonymous (not verified) on
Est. Monetary Cost
(Today's US$)
7
Est Monetary Benefits
Unknown

The project will fill critical infrastructure gaps in the Integrated Transport Network Development Plan (“ITNDP”) demonstrating use of innovative, climate-informed, safe, and nature-based solutions. It will also invest in innovative, climate resilient, nature-based design and construction solutions for roads and bridges, least-cost-engineering solutions for local infrastructure.

Integrated Disaster and Land Management Project

Submitted by Anonymous (not verified) on
Est. Monetary Cost
(Today's US$)
15.35
Est Monetary Benefits
Unknown

The project was comprehensive, using insitutional capacity building and awareness raising of SLM for DRM, using community-based activities to restore and sustainably manage areas such as the restoration of natural waterways, reforestation of hillsides and watersheds and bush fire control (Savanna, Maritime and Kara regions). Community-Based activities in Cropland and Grazing Land included SLM best practices will be piloted and promoted in targeted areas.

Himachal Pradesh State Roads Transformation Project

Submitted by Anonymous (not verified) on
Est. Monetary Cost
(Today's US$)
72
Est Monetary Benefits
Unknown

The measures to be integrated in the designs of bridges, roads and river crossings include bioengineering solutions for landslide and erosion protection, drainage systems, and so on. The resilience mainstreaming applies to the entire road under the upgradation works contract, as the road alignment falls in the midst of the Himalayan mountains. The bioengineering solutions and drainage improvement in slide risk locations apply to the roads under maintenance as well.

Subscribe to grassland and other vegetation